EN | |
  • Office Main Line(852) 2395 5388
  • Order Hotline(852) 2802 6433

News & Events

  • 2018-06-22
    OPTIMIX Tile Adhesive System for Residential Project in Guangzhou (廣州保利天悅花園)
    OPTIMIX (Greater China) and Poly Real Estate Group have been partnering in several projects in mainland China, and it’s significance to OPTIMIX has been increasing over time. This time OPTIMIX (Guangzhou) continued the partnership in a luxury residential development in Guangzhou (廣州保利天悅花園), which is located in Guangzhou Haizhu District. The development is comprised by two 20-storey and twenty-eight 40-storey buildings, providing a total construction area of around 500,000m2. OPTIMIX rendered tile adhesive products of different grade to Poly Real Estate Group, to fix tiles and stone in public area, kitchen and bathroom. Products include: •  OPTIMIX TA301 Tile Adhesive (Basic) •  OPTIMIX TA312 Tile Adhesive (General Purpose) •  OPTIMIX TA313 Tile Adhesive (Semi-Flexible)
    Read Full Story
  • 2018-06-01
    OPTIMIX Tiling System for Powerlong Wuxi, Shaoxing, Nanjing and Penglai
    Powerlong Plazas in Wuxi, Shaoxing, Nanjing and Penglai are large-scale commercial hubs for shopping, travel, entertainment, culture, gourmet, leisure, sports and international residence. Powerlong Real Estate specializes in developing and managing high-quality, large-scale and diverse integrative commercial realty projects. After experiencing stone tiling in west Hongqiao Parking Lot, OPTIMIX’s quality is validated by Powerlong Real Estate, currently covering the exhibition halls and sales offices of new construction projects in Wuxi, Shaoxing, Nanjing and Penglai. The OPTIMIX products used:   OPTIMIX TA328S Tile Adhesive (Flexible) OPTIMIX TG410ES Tile Grout (High Performance)
    Read Full Story
  • 2018-05-31
    OPTIMIX Plant Awarded “2017 BOCHK Corporate Environmental Leadership Awards - Eco Partner”
    OPTIMIX Group representatives were awarded Eco Partner certification at the prize giving ceremony of 2017 BOCHK Corporate Environmental Leadership Awards on 31th May, by Bank of China (Hong Kong) (BOCHK) and Federation of Hong Kong Industries (FHKI), in recognition of our production team’s efforts in environmental protection. BOCHK Corporate Environmental Leadership Awards aim to promote environmental practices among manufacturing and services enterprises in Hong Kong and the Pan Pearl River Delta region through rewarding the participating enterprises of their achievements in the reduction of pollutant emission. We are thankful for the organizers’ acknowledgement, which certainly motivate us from working more collaboratively to manufacture and advertise better construction materials for the sake of the entire building and construction industry so as to build a more comfortable and eco-friendly environment for everyone. 
    Read Full Story
  • 2018-03-14
    OPTIMIX Repairing System for Lisboa Palace Hotel, Macau
    Operated by SJM Holdings Ltd, The Lisboa Palace Hotel forms part of the development of the new Cotai casino resort Grand Lisboa Palace, which is near to Macau East Asian Games Dome. Featuring three luxurious hotels - The Lisboa Palace Hotel, Palazzo Versace Macau, and Karl Lagerfeld Hotel luxury boutique hotel - Grand Lisboa Palace is inspired by European landmark architecture while incorporating both traditional Chinese motifs and elements of Chinoiserie. OPTIMIX offers a safe and trustworthy concrete repairing solution to Lisboa Palace Hotel, by applying OPTIMIX RM770 Repair Mortar (Sprayable). Suitable for reinstatement of large areas of spalled concrete caused by corrosion and damage, the sprayable OPTIMIX RM770 allows the remedial work to complete faster and more cost-effectively.
    Read Full Story
  • 2018-02-17
    OPTIMIX Repairing System Applied in Kwai On Factory Estate
    Dilapidated factory estates are commonly seen in Hong Kong. The exterior of the building might be damaged over time without proper maintenance. OPTIMIX provided instant repairing solution to the carpark of Kwai On Factory Estate, which is a 15-storey building built in 1979, with a total of 766 rental flats. Simply recasting the concrete floor with our highly fluid repair mortar, primer and 10mm aggregate, the severely damaged floor was quickly reinstated and was open to use after a few hours. Products used:   OPTIMIX  RM780 Repair Mortar (Rapid Setting) OPTIMIX  SF80     Primer OPTIMIX  10mm  Aggregate
    Read Full Story