EN | |
  • Office Main Line(852) 2395 5388
  • Order Hotline(852) 2802 6433

News & Events

  • 2019-05-07
    OPTIMIX Full System for Greenhill Villa
    Greenhill Villa, a Subsidised Sale Flats project of the Housing Society, is located in Area 36C, Siu Lek Yuen (Shatin Town Lot 609). The site area is approximately 11,800m2 , comprises three 32 to 36-storey residential flats on top of a 4-storey high podium. The Housing Society describes the building concept as "practical but not extravagant", the choice of building materials used in these small-to-medium flats focuses on practicality, stability and durability. Other than fundamental building structure, all the materials inside out are from OPTIMIX:   OPTIMIX BP126 Base Plaster OPTIMIX BP138 Base Plaster (Waterproof) OPTIMIX FS161 Floor Screed (Waterproofing) OPTIMIX F12 Masonry Mortar OPTIMIX TA328 Tile Adhesive (Flexible) OPTIMIX TG410E Tile Grout (High Performance) OPTIMIX WP533 Waterproofing Slurry (Semi-Flexible) OPTIMIX EVA Emulsion
    Read Full Story
  • 2019-04-24
    OPTIMIX Restoration Work For Macau Border Gate Terminal
    Macau Border Gate Terminal was closed down after the attack of Typhoon Hato. The SAR modified the original renovation plans into two phases for complete recovery, and the project was initially estimated to be finished in two years. Fortunately, the site is back in service earlier than estimate with the cooperative effort by the SAR and contractors. Under a critical downtime, OPTIMIX in this project provides cementitious materials working with the construction team’s request of nighttime and holiday work, speeding up the recovery to allow the terminal to be re-opened at the end of November, 2018.   The OPTIMIX products used:   OPTIMIX BP126 Base Plaster OPTIMIX BP138 Base Plaster (Waterproof) OPTIMIX TA328S Tile Adhesive (Flexible) OPTIMIX TG410ES Tile Grout (High Performance) OPTIMIX SC228 Skimcoat OPTIMIX FS161 Floor Screed (Waterproofing)
    Read Full Story
  • 2019-03-13
    OPTIMIX Tiling System for Spring City 66
    OPTIMIX (Guangzhou) was confirmed to be the tile adhesive supplier of this entire construction project with TA312 and TA313, fulfilled by three different subcontractors. Located in Kunming’s Panlong District, the financial and commercial hub of the city, Spring City 66 occupies the core of the upcoming central business district. The project, a mixed-use complex with a total gross floor area of approximately 433,500 square meters, comprises a world-class shopping mall, a Grade A office tower and serviced apartments. All tiles are applied with our company’s products, weighing around 2000 tons. OPTIMIX TA312 Tile Adhesive (General Purpose) and OPTIMIX TA313 Tile Adhesive (Semi-Flexible) are both of high quality adhesive with TA313 observing the standards of EN12004 Class C1T, being the confident and reliable choice in the industry.
    Read Full Story
  • 2019-02-20
    OPTIMIX Full System Support for Shun Tak Centre Renovation
    Shun Tak Center - the indispensable commercial and transportation complex in Sheung Wan - comprises a 4-storey shopping center, carpark, and two 38-storey office towers. It is not only the headquarters of Shun Tak Group, but also a transportation hub to millions passengers, who are connected there by MTR, buses and ferries.   To maintain Shun Tak Center which ages over 30 years, OPTIMIX (HONG KONG) supplied a full system renovation solution; systems of plastering, tiling, waterproofing, grouting, repairing, flooring and emulsion are applied: • OPTIMIX BP138 Base Plaster (Waterproof) • OPTIMIX TA328 Tile Adhesive (Flexible) • OPTIMIX WP533 Waterproofing Slurry (Semi-Flexible) • OPTIMIX NS612 Non-Shrink Grout • OPTIMIX RM725 Repair Mortar (HKHA Class25) • OPTIMIX RM740 Repair Mortar (HKHA Class 40) • OPTIMIX SF828 Self-Levelling Screed (Overlayment) • OPTIMIX Procrete • OPTIMIX PE Polymer Emulsion
    Read Full Story
  • 2019-01-21
    OPTIMIX Tiling System for Qianhai Kerry Center
    Qianhai Kerry Center, located in Qianhai Nanshan District, Shenzhen, was developed into two phrases to 8 buildings of residential buildings, commercial buildings and hotel with total construction area of about 320,000 m2. The Center incorporates greening into different parts of the buildings, such as sunken plaza, sky garden and parks, even upper area and the rooftop are inclusive to the green construction in creating a vertically green and sustainable environment. Hence, the residential and commercial buildings of the Center have been attained LEED-CS Gold and LEED-CS Platinum respectively from the U.S. Green Building Council (USGBC). In this project, two tile adhesive products from OPTIMIX (Shenzhen) was endorsed and adopted by applicator: •  OPTIMIX TA301 Tile Adhesive (Basic) •  OPTIMIX TA313 Tile Adhesive (Semi-Flexible)
    Read Full Story